Palm Beach Atlantic undertakes campus renovations

The Gregory School of Pharmacy building will receive a fresh coat of paint on its exterior, as will the Warren Library.
The Gregory School of Pharmacy building will receive a fresh coat of paint on its exterior, as will the Warren Library. | File photo

Palm Beach Atlantic University is undertaking a number of renovation and improvement projects on its campus that are set for completion before students return in August.

The administration is refreshing Rinker and Weyenberg Residence Halls. The Gregory School of Pharmacy building will receive a fresh coat of paint on its exterior, as will the Warren Library entrance, which will also have some concrete repaired.

MacArthur and Rinkler Halls will receive new classroom doors, and some of the Wean Faculty Club exterior doors will be refinished. At Borbe Hall, renovations included new porcelain tile in the east entrance of the lobby and new bulletin boards throughout the building. Okeechobee Hall will have its air conditioning replaced.

The entryway for the Fraser Dining Hall and Lassiter Student Center will be resurfaced. Additionally, the parking lot for Sachs Hall will be repaired and sealed. Finally, the school is installing an additional alert notification system for enhanced security.

These projects are not expected to interfere with camps and other uses of the campus that are scheduled for this summer.